Location: Bickleton, Washington
Project: Wind Energy
Schedule: Approximately 6 days per week, subject to weather conditions
Start: October 2026
Estimated duration: Through December 2026, with a planned winter weather shutdown and expected restart around March 2027
EOSOL Group is looking for an experienced Blade Repair Inspector to support wind turbine blade repair activities in Bickleton, Washington.
The inspector will be responsible for monitoring and reporting repair progress, reviewing repair documentation, and documenting daily site conditions and repair activities.
The role requires hands-on knowledge of composite material repair methods and familiarity with work practices involving the application and handling of chemicals used in composite blade repairs.
The initial assignment is expected to run through December 2026, followed by a planned pause due to winter weather conditions. Work is expected to resume around March 2027, subject to project conditions.
This is an on-site field position supporting wind turbine blade repair activities.